LFOM Entrance Tank Mathcad Code Documentation
Mathcad Code
The mathcad code can be found here. You will need to have mathcad installed on your computer in order to open the file.
Variable Description Table avaiable here.
Updates
- How do we determine the number of riser pipes necessary for the plant, currently the code assumes only one riser pipe is necessay? The number of riser pipes should be based on the price variation of PVC pipe as the diameter increases, if the wide diameter price is too high then it would be beneficial to incorporate 2 riser pipes. Attached is a price comparison for PVC pipe of varying diameters, link to comparison page