You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

Team Tasks (with optimal number of students)

Design (4)

  • update design algorithm descriptions
  • update variable list
  • design plants for Agua Para el Pueblo
  • create method to make it possible to choose a layout
  • complete documentation of AutoCAD script generation
  • add AguaClara design stamp and disclaimer to drawing
  • create layouts of useful views
  • Complete LabVIEW online tool
  • Create materials list

Research

Tube Floc

  • Develop the optimal relationship between G and Gθ

Linear Flow Orifice Meter

  • Test the new design algorithm for linearity

Flow Controller linearity and calibration

Flow Controller chlorine metering

  • test linearity of response and create calibration protocol

Automated chemical doser

Outreach

Wiki

  • Develop organizational guideline for wiki
  • Develop guidelines on wiki page size to improve download speed
  • Improve theme to make browsing easier and to give a more professional appearance
  • No labels