Linear
...
Orifice
...
Flow
...
Meter
...
Variable
...
Description
...
Table:
...
in
...
order
...
of
...
appearance
...
in
...
code
...
Variable |
|---|
...
Name |
|---|
...
Variable |
|---|
...
Description |
|---|
...
|
...
Number |
...
of |
...
riser |
...
pipes |
...
|
...
minor |
...
loss |
...
coefficient |
...
for |
...
rapid |
...
mix |
...
|
...
Combined |
...
area |
...
of |
...
all |
...
orifices |
...
|
...
function |
...
for |
...
determining |
...
the |
...
orifice |
...
areas |
...
as |
...
the |
...
vertical |
...
distance |
...
on |
...
the |
...
riser |
...
pipe |
...
increases |
...
|
...
headloss |
...
through |
...
the |
...
Lfom, |
...
and |
...
the |
...
minimum |
...
height |
...
of |
...
the |
...
water |
...
in |
...
the |
...
entrance |
...
tank |
...
|
...
minor |
...
loss |
...
coefficient |
...
for |
...
an |
...
orifice |
...
(was |
...
K |
...
orifice) |
...
|
...
plant |
...
flow |
...
rate |
...
|
...
the |
...
inner |
...
diameter |
...
of |
...
the |
...
riser |
...
pipe |
...
|
...
ratio |
...
of |
...
LFOM |
...
pipe |
...
area |
...
to |
...
orifice |
...
area |
...
|
...
nominal |
...
diameter |
...
of |
...
the |
...
riser |
...
pipe |
...
and |
...
rapid |
...
mix |
...
pipe |
...
|
...
enumerated |
...
type |
...
of |
...
pipe |
...
|
...
rapid |
...
mix |
...
head |
...
loss |
...
|
...
The |
...
total |
...
pipe |
...
length |
...
betweeen |
...
the |
...
bottom |
...
of |
...
the |
...
orifices |
...
and |
...
the |
...
flocculator |
...
|
...
viscosity |
...
of |
...
water |
...
through |
...
the |
...
plant |
...
|
...
PVC |
...
pipe |
...
roughness |
...
|
...
Function |
...
based |
...
off |
...
of |
...
ramp |
...
functions, |
...
this |
...
is |
...
an |
...
incremental |
...
function |
...
that |
...
all |
...
ows |
...
other |
...
funtions |
...
to |
...
evaluate |
...
one |
...
level |
...
of |
...
orifices |
...
at |
...
a |
...
time |
...
|
...
vertical |
...
distance |
...
between |
...
orifices |
...
|
...
elevation |
...
between |
...
orifice |
...
rows |
...
at |
...
which |
...
the |
...
flow |
...
is |
...
calibrated, |
...
a |
...
0 |
...
or |
...
1 |
...
value. |
...
0 |
...
corresponds |
...
to |
...
the |
...
current |
...
row |
...
and |
...
1 |
...
corresponds |
...
to |
...
the |
...
next |
...
row |
...
|
...
funtion |
...
to |
...
determine |
...
target |
...
riser |
...
pipe |
...
flow, |
...
incrementally |
...
calculates |
...
flows |
...
|
...
funtion |
...
to |
...
determine |
...
actual |
...
flow |
...
through |
...
orifices |
...
|
...
number |
...
of |
...
orifices |
...
|
...
diameter |
...
of |
...
Lfom |
...
orifices |
...
|
...
function |
...
that |
...
determines |
...
the |
...
diamter |
...
of |
...
a |
...
circle |
...
given |
...
the |
...
area |
...
|
...
function |
...
that |
...
determines |
...
the |
...
drill |
...
bit |
...
size |
...
necessary |
...
|
...
arbitrary |
...
value |
...
determines |
...
the |
...
number |
...
of |
...
orifices |
...
in |
...
the |
...
first |
...
row, |
...
currently |
...
5 |
...
is |
...
selected |
...
|
...
percent |
...
error |
...
in |
...
the |
...
actual |
...
flow |
...
rate |
...
compared |
...
to |
...
theoretical |
...
values |
...
|
...
maximum |
...
error |
...
of |
...
Q_LfomError |
...
array |
...
|
...
headloss |
...
from |
...
the |
...
entrance |
...
tank |
...
to |
...
the |
...
flocculator |
...
|
...
water |
...
depth |
...
of |
...
entrance |
...
tank |
...
relative |
...
to |
...
the |
...
bottom |
...
of |
...
the |
...
sedimation |
...
tank |
...
|
...
height |
...
of |
...
the |
...
start |
...
of |
...
the |
...
floculation |
...
tank |
...
relative |
...
to |
...
the |
...
bottom |
...
of |
...
the |
...
sedimention |
...
tank |
...
|
...
difference |
...
between |
...
height |
...
of |
...
water |
...
in |
...
floculation |
...
tank |
...
and |
...
the |
...
bottom |
...
set |
...
of |
...
orifices |
...
on |
...
the |
...
LFOM |
...
|
...
maximum |
...
water |
...
level |
...
in |
...
entrance |
...
tank |
...
|
...
minimum |
...
water |
...
level |
...
in |
...
entrance |
...
tank |
...
|
...
height |
...
of |
...
entrance |
...
tank walls | |||
| height of entrance tank above the top of the riser pipe | ||
|
...
|
...
| safety factor of height of riser pipe above top row of orifices | ||
| height of the riser pipe |