Spring 2011 Challenges
Outreach (6-10)
Design (15-20) in Accel
...
Research Challenges (Matt)
- Stacked Filtration (6) in B63 along window: two team members as joint members of Design team
- Foam
...
- Filtration (4) in B63 on
...
- right end of bench top
- Plate Settle Spacing (
...
- 3) in B60
- Chemical Dose Controller (
...
- 3) in B60:
...
- one team members as joint
...
- member of Design team
...
- Sedimentation (3)
Invent Challenges (Monroe)
- Turbidimeter (3)
- Fabrication (4)
- Water Pump (3)
- Stock Tank Mixing (3)
- High Flow Chemical Dose Controller
- Structure
(estimated number of students per team)
| Include Page | ||||
|---|---|---|---|---|
|
| Include Page | ||||
|---|---|---|---|---|
|
Research Challenges
| Include Page | ||||
|---|---|---|---|---|
|
| Include Page | ||||
|---|---|---|---|---|
|
| Include Page | ||||
|---|---|---|---|---|
|
| Include Page | ||||
|---|---|---|---|---|
|
| Include Page | ||||
|---|---|---|---|---|
|
Invent Challenges
| Include Page | ||||
|---|---|---|---|---|
|
| Include Page | ||||
|---|---|---|---|---|
|
| Include Page | ||||
|---|---|---|---|---|
|
| Include Page | ||||
|---|---|---|---|---|
|
| Include Page | ||||
|---|---|---|---|---|
|
| Include Page | ||||
|---|---|---|---|---|
|