Spring 2011 Challenges
Outreach
(6-10)
Design
(15-20) in Accel
Research Challenges (Matt)
Stacked Filtration
(6) in B63 along window: two team members as joint members of Design team
Foam Filtration
(4) in B63 on right end of bench top
Plate Settle Spacing
(3) in B60
Chemical Dose Controller
(3) in B60: one team members as joint member of Design team
Sedimentation
(3)
Invent Challenges (Monroe)
Turbidimeter
(3)
Fabrication
(4)
Water Pump
(3)
Stock Tank Mixing
(3)
High Flow Chemical Dose Controller
Structure
(estimated number of students per team)
Team organization survey
Research Challenges
Invent Challenges