*** This version of Confluence is for testing only and contains a copy of content from June 29th 2026. No changes will be preserved. ***
Floating Flocs Meeting Minutes
Spring 2009 Minutes
July 22, 2009
Working Group: Fluidized Bed
Accomplishments
- Repeated DO measurements. Sampling points included:
- source water
- effluent from the aerator
- effluent from the sand filter
- effluent from the bubble collector
Issues
- *