You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

Future Tasks

Improve flow distribution from Inlet Manifold
*Taper the inlet manifold cross area
*Taper the inlet manifold ports
*Taper cross area and ports

Design Floc Hopper
*PVC funnel connected to pvc pipe
*Concrete box attached to the wall of the sedimentation tank
*Concrete box with plate settlers

Include filtration to the AguaClara plants
*

  • No labels