Flow Control Module
Linearization and Calibration
Overview
Presently, the flow control module is to more accurately parametrize the functionality of the Flow Control Module. This project section is attempting to resolve the mystery of where inconsistencies arise that cause deviations from the standardized equations that relate head loss and flow rates which are used to dose the flow of the water treatment plant. Linearization and Calibration team goals and meeting minutes.
Methods and Results from Specific Experiments
- A simple test where float valve parts were left in alum and chlorine for extended periods of time to determine corrosion effects
Flow controller body design and selection
- Includes notes on the brainstorming that went into FCM parts selection and design
Flow versus head loss data collection in the turbulent range
- Experiments were conducted to establish a model for the relationship between FCM outflow and headloss associated with outflow tube position
Determining the maximum inlet shut-off pressure
- The maximum inlet pressure that the float valve can shut off was investigated in order to determine how much head there can be between the chemical stock tanks and the flow controllers
- Background on previous research