Accomplishments

11/09/08
-removed sutro-weir support structure
-played with alum dosing making sure flow rate stays steady and used tank light to determine optimal floc formation
-bought pvc and created connection, so the inlet doesn't pour in over baffles
-bought pvc pipe to cut to reconfigure uniform spacing
-replaced light bulb in tank light, so we can observe floc formation in the flocculator
11/10
-determined that energy dissipation in uniform flocculator was too low
11/11
-Henry and Christine cut pvc piping for uniform baffles (15cm).

Outcomes

-need to replace baffles in uniform flocculator and end of tapered flocculator with 13 cm spacing
-need to replace baffles/ recut pvc
-Tom is ordering tubing for tube flocculator

Issue

-pump
-electric current in tank