Pilot Plant Flocculator Goals

Fall 2008 Team Members

Fall 2008 Goals

Resetting Tube Flocculator (9/4/08)

Become familiar with plant set-up and create semester goals (9/11/08)

Start up tube flocculator with vacuum pump (9/18/08)

Compare results from the uniform and non-uniform baffle configuration results from the flocculaiton tank (11/1/08) 

Create floc profile for tube flocculator (9/26/08)

 Write Midterm Report (10/14/08)

Measure settling velocity of flocs in the tube flocculator with and without upflow (11/5/08)

Tapered Flocculation

Prepare final presentation and report (12/12/08)