Team Members

Goals

Fix leaks in plant leveling tank and pipes in order to run tanks. (9/19/08)

Become familiar with process controller. (9/22/08)

Construct new weirs for the plant leveling tank that allow for parallel tanks to run at flow of 100, 120 and 70 m/day. (9/23/08)

Try to form floc blanket without lamella in second tank to determine if pipe inlet is interfering with blanket formation. (10/5/08)

Write Midterm Progress Report (10/14/08)

Form a floc blanket with lamella in the tank (11/5/08)

Test lamella spacing (11/28/08)

Write Final Report and prepare presentation (12/12/08)