General Program Information
Input Definitions
- p1 is a 3,1 matrix with the x,y,z values of the center of first pipe in the tee.
- p2 is a 3,1 matrix with the x,y,z values of the center of second pipe comprising the tee.
- p3 is a 3,1 matrix with the x,y,z values for the length of the second pipe.
- p4
- p5
- p6
- p7
- p8
- p9
- p10
- p11
- p12
- p13
- p14
- p15
- p16
- p17
- p18
- p19
- p20
- p21
- p22
- p23
- p24
- R1
- R2
- R3
- L
- H
- win1
- win2
- win3
- win4
Technical Program Outline