A snapshot of the UPS's used to support servers, switches, and other equipment under ChemIT's management. Mostly within ChemIT's Baker 248 server room. |
Cluster name | UPS for | Maintenance | Upgrade status |
|---|---|---|---|
NONE |
| 4/14: Within a year, upgrade OS? | |
(unknown) |
| n/a | |
Done Spring'14 |
| Fall'13: Upgraded OS and added 2 nodes | |
Done Spring'14 |
| Winter'13/14: Upgraded OS and added 2 nodes | |
Done Spring'14 |
| Spring'14: Upgraded OS and added 2 nodes | |
NONE |
| 4/14: When do OS upgrades, and why? | |
Done Fall'14 |
| Summer'14: $50K hardware upgrades; to include OS upgrade. | |
Yes |
| Spring'14: Upgraded OS and added 2 nodes | |
ChemIT (C4) | Done |
| 4/14: When turn into production, and for whom? |
Totals: |
|
|
|
Inventory and summary notes regarding non-cluster HPC systems in 248, including computational stand-alone systems.
Columns needed - software installed / managed (do per system; dedicated page?), Cores, Age, storage and related (RAID: h/w or s/w?)
Name of system, and purpose | ChemIT | DNS name | IP | ChemIT Network | Headnode IPMI Network | OS | OS Version | UPS | Maintenance | Upgrade status |
|
|---|---|---|---|---|---|---|---|---|---|---|---|
Baird: 1 rack-mounted computational computer | ChemIT | as-chm-bair-08.ad.cornell.edu compute.baird.chem.cornell.edu | 10.253.229.178 | 192.168.255.120 | 192.168.255.121 | Windows Server | 2012R2 | NONE |
|
|
|
Freed: Eldor | ChemIT | eldor.acert.chem.cornell.edu | 10.253.229.96 | 192.168.255.87 | CentOS | 6.4 | NONE |
|
|
| |
Petersen: 2 rack-mounted computational computers | ChemIT | calc01.petersen.chem.cornell.edu | 10.253.229.196/192 | Windows Server | 2012R2 | Yes, but needs to be deployed in true production; using Widom's UPS for now. |
|
|
| ||
Scheraga: 4 GPU rack-mounted computational computers | ChemIT | gpu.scheraga.chem.cornell.edu | 10.253.229.70 | 192.168.255.139 | 192.168.255.138 | CentOS | 6.4 | NONE |
|
|
|
Assuming protection for 1-3 minutes MAXIMUM:
Do all head nodes and stand-alone computers in 248 Baker Lab
CCB head nodes' UPS status:
Most we been done Spring 14, after the spate of power failures. See CCB's HPC page (first chart, in "UPS for headnode" column) for details
Cluster | Done | Not done | Notes |
|---|---|---|---|
Loring |
| X | Unique: Need to do ASAP |
Abruna |
| X | Unique: Need to do ASAP |
See CCB's HPC page (second chart, in "UPS" column) and CCB's non-HPC page (in "UPS" column) for details of the few that are already done.
Stand-alone computers' UPS status:
Computer | Done | Note done | Notes |
|---|---|---|---|
Coates: MS SQL Server |
| X | Unique: Need to do ASAP |
Freed: Eldor |
| X | Unique: Need to do ASAP? (Q: Is OS backed up?) |
Baird: 1 rack-mounted computational computer |
| X | Need? |
|
|
|
|
Review others at above two cited pages which might need a UPS, after above ones done.
Do all switches: Maybe ~$340 ($170*2), every ~4 years.
Do all compute nodes: ~$18K initially, and perhaps ~$4.5K every ~4 years to replace batteries and deal with UPS hardware failures.
Compute node counts, for UPS pricing estimates. Does not include head node:
Cluster | Compute node count | Power strip equivalents | Cost estimate, | Notes |
|---|---|---|---|---|
Collum | 8 | 1 | $900 |
|
Lancaster, with Crane (new) | 10 | 2 | $1.8K |
|
Hoffmann | 19 | 2 | $1.8K |
|
Scheraga | 91 | 13 | $11.7K |
|
Loring | 4 | 1 | $900 |
|
Abruna | 9 | 1 | $900 |
|
C4 head node: pilot | N/A | N/A | N/A | This CCB Community head node pilot has no compute nodes of its own. |
Widom | 2 | 1 | ? | Compute nodes are hanging off of "C4" head node, above. |
TOTALS | ~140? | 21 | $18K + Widom |
|