Spring 2011
This wiki page is mainly for internal PSS communication. For more information about the Plate Settler Spacing team team, go to the Structure Team page.
Detailed Task List
• Determine moment in column at incipient cracking in the tension face and set this moment as our maximum allowable moment
• Transpose our column design calculations to a MathCAD file from Excel
• Convert calculations and tables to the metric system
• Write a MathCAD file that will produce column sizing and spacing given key inputs such as the dimensions of the tank and height of the water; this will include rebar size and amount of rebar used
|