We have strong evidence that air is being trapped in the vertical section of the rapid mix tube below the micro mix orifice. The head loss in the rapid mix tube increases causing the entrance tank to overflow even though the flow rate is less than the design flow rate.
We hypothesize that the air slow accumulates below the vena contracta because the velocity in the vena contracta is too high for air bubbles to travel upward. Below the vena contracta where the velocities are lower the water velocity is too low to carry the bubbles down and into the flocculator. In addition, the pressure in the middle of the vena contracta can be reduced significantly. At Agalteca the dosing tube was hanging down into the vena contracta. The low pressure in the vena contracta may have caused air to flow through the dosing tube into the vena contracta.
To solve these problems we need to make several changes.
Powdered poly aluminum chloride is being used in Guatemala at one of their hydraulic water treatment plants (El Cambray). This provides a new opportunity for a way to treat water with low alkalinity. Apparently the costs are comparable to alum because you use less of the product, but it costs more per kg. Contact Grasim Industries to determine how to access their product and to see if they are willing to donate some of their product with their charity work.
This topic has come up several times and could be a significant contribution.
Build on the automated dose controller to create a device that automatically meters in the correct amount of chlorine when a valve is opened to take water from a public standpipe.
Add a technology selection guide to our website. Provide the basic information on selecting the best water sources and the best treatment processes for those water sources. Describe the data necessary to make an informed engineering decision.
Create a clear description of the AguaClara technologies for the website.