h1. General Program Information
 
{float:left|border=2px solid black}
[!baffle port.PNG|width=450px!|AutoCAD Channel Program]
View of Baffle Port
{float}\\

The program draws square ports on alternating sides of the lower baffles. The ports must be drawn on alternating sides so that when the plant in running, water does not have the opportunity to flow in a straight path through the flocculator (thus bypassing the mixing.)


h1. Technical Program Information