"Chemical Dose Controller" Meeting Minutes

Spring 2009 Minutes

"July 24, 2009"

Working Group: Chemical Dose Controller

Accomplishments

Since we were running the experiment on 7.5cm diameter LFOM, which is less diameter used in the water plants in Cuatro Comunidades, even if water over flowed upon placing of the 6cm diameter tubing at 150 gak/min, this result made us confident that this tubing would work, bearing in mind that Cuatro Comunidades water plant's max flow rate is 100 gal/min.

Finish up design work and work on non-linear dose control MathCAD file.

Any Overall Team Comments:

Final weeks are getting intense, I Like it!