**The group will work together and hopes to accomplish this within a three week period
Week 1: Varying Alum Dosage (35 mg/L, 45 mg/L, 55 mg/L, 65 mg/L)
Week 2: Varying Turbidity
Week 3: Varying Location of Alum Addition (above water surface vs below water surface)
Week 4: MathCad Revision
Week 5: Construction of Level Arm
Week 6: Assembly of Non-Linear Dose Controller
List references for your project that your team has found in literature searches.