Goals for Summer 2009

Team Leader: Francine Mitto

Summer 2009 team members

Summer 2009 Goals

Week 1: Varying Alum Dosage (35 mg/L, 45 mg/L, 55 mg/L, 65 mg/L)

Week 2: Varying Turbidity

Week 3: Varying Location of Alum Addition (above water surface vs below water surface)

Week 4: MathCad Revision

Week 5: Construction of Level Arm

Week 6: Assembly of Non-Linear Dose Controller

Bibliography

List references for your project that your team has found in literature searches.