Honduras Interns Progress Report

Date: 12/17/07
Location: Ojojona

Ojojona

Plant

(picture included) We tried Monroes idea of lifting the baffles with the a beam and it worked beautifully. We used a 2x6 beam that spanned the length of the tank. When the spacers and the beam were tied the beam was lifted and a brick put under the beam on each side to suspend the laminas. This was done before the tank was empty which I think helped to make it easier to lift the laminas and not have them run during draining. It suspended the laminas about 15 cm and worked beautifully.
There was one problem however, and that is with the tapaderas there isn´t a way to leave the beam in place above the tank. Therefore instead of tying knots the string was simply wound once around the spacers so the wire could be slid back and forth. The string was left in place with another piece of string in place of where the beam should be to keep it out of the water. While this works it is not idea and can be tricky with the string as it easy to confuse which part of the string is which once the beam is gone.
For the Tamara design however it is possible to leave the beam in place. However for a more permanent solution another material besides wood or perhaps another way to remove the beam should be found (as well as for Ojojona).

Siguatepeque

Tamara

Design for Tamara

The plan above shows the partition of the roof and the slopes. I don't remember the dimensions exactly but I believe that the heighest part of the roof is the corner above the barrels at 3.5 meters above the floor.

Plans for the Future