As the AguaClara project continues to expand, the desire to design and construct water treatment plants as efficiently and effectively as possible is becoming more relevant. The plate settlers that AguaClara is currently designing and suggesting that the communities build are relatively cheap to build, but are extremely meticulous and time intensive to construct. This page is dedicated to an assessment of outsourcing the construction and possibly the design of the settlement systems in AguaClara water treatment plants. It takes into account economics, maintenance, durability, environmental impact, and supply chain issues.
Figure 1. Rendering of a module of plate setter.
Figure 1 depicts a plate settler module. AguaClara plate settler modules have an active area of1 meter in width and 1 meter in length (1m x 1m). Each plate is 1 meter long (L). That is 1 meter length at 60 degrees. The spacing between baffles is 5 cm.
Table 1. The cost of a module of plate settler.
Table 1 details the cost of a 1 square meter module of plate settler. The specific cost of a module is $298.02. At this price the cost of the Gracias plate settler system will be $9024.68.
|
Please attach this spreadsheet, not just a picture of it, so the actual calculations can always be reviewed. Also insert the equations you used on this page so anyone can see what procedures you used to do these calculations. |
Brentwood Industries
Enviropax
Siemens
Meurer Research Inc.
Recommendations After Analysis