Design Team Meeting Minutes

Spring 2009 Minutes

2/6/09

Accomplishments

• Change flocculator energy dissipation program back to handle arrays so that we can have uniform and tapered baffle spacing
o Fix the placement code for the baffles Sara
• Change drain so that the pipe is now a rectangular channel Heather H
• Change inlet "pipes" so that they are inlet rectangular columns
o Not longer than width of inlet channel or wider then width of inlet slope Adela
• Need to modify the slopes program so that the widths of the slopes are the width of the sed tank/2 - the width of the dran/2. Width of the drain is set. Height of the drain is a variable Heather R
• Adjust the entrance tank so that the dimensions of the tank are specified based on an entrance tank upward velocity, which is 700m/day which is 1/10th the size of the sed tank. Depth is constrained by the floating floc people. Reiko

Metrics
Outcomes
Issues

Working Group: 2

Accomplishments
Metrics
Outcomes
Issues

Any Overall Team Comments: