Name Size Creator Creation Date Labels Comment  
JPEG File SES Gantt.JPG 45 kB user-c84da Mar 13, 2008 22:11
  • No labels
Gantt Chart Sara Schwetschenau  
JPEG File submerged light.JPG 10 kB user-c84da Mar 13, 2008 21:37
  • No labels
schematic for set-up of submerged light  
File tank with manometer.JPG 17 kB user-c84da Mar 13, 2008 19:11
  • No labels
Head Loss Measurement Configuration  
File Increment Alum Data pull v1.xmcd 1.39 MB user-a4192 Mar 13, 2008 12:40
  • No labels
   
File Start and Stop Row.xmcd 1.62 MB user-a4192 Mar 13, 2008 12:39
  • No labels
   
File GrabSample4.JPG 17 kB user-a4192 Mar 11, 2008 09:30
  • No labels
   
File GrabSample3.JPG 25 kB user-a4192 Mar 11, 2008 09:30
  • No labels
   
File GrabSample2.JPG 17 kB user-a4192 Mar 11, 2008 09:29
  • No labels
   
File GrabSample1.JPG 26 kB user-a4192 Mar 11, 2008 09:29
  • No labels
   
JPEG File section 3 flow 114.JPG 18 kB user-c84da Feb 28, 2008 18:42
  • No labels
graph of turbidity data at flow of 114mL/min (section3)  
JPEG File section 3 flow 50.JPG 16 kB user-c84da Feb 28, 2008 18:42
  • No labels
graph of turbidity data at flow of 50mL/min (section3)  
JPEG File graph turbidity data set-up 2.JPG 43 kB user-c84da Feb 28, 2008 18:34
  • No labels
graph of results for set-up 2  
JPEG File turbidity data set-up 2.JPG 32 kB user-c84da Feb 28, 2008 18:31
  • No labels
set-up two, done to establish if flocs were breaking up between the second and third sections  
JPEG File turbidity data set-up 1.JPG 38 kB user-c84da Feb 28, 2008 18:01
  • No labels
Graph (original set-up) summer 07  
JPEG File alum dose 05.JPG 15 kB user-c84da Feb 28, 2008 13:07
  • No labels
Derived Alum Dosing equation 2005  
JPEG File tube settler set-up summer 07.JPG 31 kB user-c84da Feb 28, 2008 13:00
  • No labels
Schematic of the original Tube Settler Configuration  
JPEG File head loss graph.JPG 17 kB user-c84da Feb 27, 2008 21:03
  • No labels
head loss graph  
JPEG File vertical flow path.JPG 17 kB user-c84da Feb 27, 2008 20:59
  • No labels
tank flow path (side view)  
JPEG File tank flow path.JPG 11 kB user-c84da Feb 27, 2008 20:59
  • No labels
tank flow path (top view)  
JPEG File G,GthetaCurve.JPG 11 kB user-c84da Feb 27, 2008 18:35
  • No labels
G, Gtheta design curve  
  1. Prev
  2. 1
  3. 2
  4. 3
  5. 4
  6. Next