PSS Meeting Minutes
Fall 2008 Minutes
11/21/08
Accomplishments
- We change one of the flocculator due to a build up of what looks like mold.
- Tested out the system for air leaks, turbidity control and
- Tested the floc production with half the flow rate, then increased back to our desired level
Metrics
- none
Outcomes
- We are getting adequate floc production with our ideal flow rate
Issues
- We need to make a stable floc blanket
- We are begining to record data and will be running official experiments starting this weekend.
- We are begingng to document the improvements of the set up and the methods for running the system.