Pilot Plant Meeting Minutes
Spring 2009 Minutes
April 17, 2009
Working Group: 1
Accomplishments
- Replaced tubing through peristaltic pump with size 13 tubing to dose PAC more accurately
- Fixed loose wiring in fourth turbidimeter so it registers in Process Controller
- Plant is fully operational
- Tested configuration 1 (1st channel baffle spacing: .051 m, 2nd channel baffle spacing: .051 m)
Outcomes
- A summary of resolutions based on what was accomplished.
- New directions and ideas that result from these resolutions.
Issues
- Are running out of time to complete all configuration profiles before Wiki Report is due. As resolution we completed a counterproposal to extend the due date for submission to Monroe.