Floating Floc Meeting Minutes

Spring 2009 Minutes

February 20, 2009

Accomplishments

  • The sand filter group have completely setup the Process Control for their setup.
  • Final decision on the setup for the relevant literature page: Title, Summary, Link to URL or PDF.

Metrics

  • The sand filter is almost complete except for an additional hole in the flow accumulator for the initial DO probe.
  • Calibrated the two DO probes for the sand filter setup to measure the DO content before and after the water flow through the sand layer.
  • Completion of the diagram of the sand filter.

Outcomes

  • The sand filter group will meet on Saturday to do the first run with the new and completed setup.

Issues

  • The sand filter setup need another hole 3/8" for another DO probe for the initial DO reading.
  • Both subgroups need to complete the summaries of relevant literatures before the next Meeting Minutes.