Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migration of unmigrated content due to installation of a new plugin

Spring 2009 Semester Contribution

I have become familiar running and troubleshooting the Pilot Plant vertical flow hydraulic flocculator and worked on running the tube flocculator so that it can be used to collect data. I also helped the sed tank team create their goals and task lists for the semester. I coordinated the Pilot Plant team meetings and tried to keep both subsections of the the group on taskam on the Chemical Dose Controller/ Rapid Mix Design Team this spring semester. I have worked on the MathCAD file to design the nonlinear Chemical Doser which we are in the preliminary stages of building. I have worked on the organization design and composition of the sed tank and flocculation wiki pages on the pilot plant section. I worked on the team report uniform vs. tapered baffle configurations and the tube flocculator page Construction Historycalculations for the rapid mix tank at the Gracias Plant and the incorporation of the design into the Master Program. I have worked on the wiki report for both the nonlinear doser and the rapid mix design.

Wiki Markup
{content-by-user:jhs54}{content-by-user}