Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migration of unmigrated content due to installation of a new plugin

...

This program draws couplings in every other channel of the flocculator. Since drains must always be put in the first and last channels of the flocculator, in the event of an even number of channels, there will be two drains placed contiguously in the channels closest to the entrance tank. This code is the same for horizontal and vertical flocculators.

Wiki Markup
{float:left|border=2px solid black}
[!coupling.bmp|width=200px!|AutoCAD Channel Program]
Coupling
{float}


Technical Program Outline

...