Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Please review the challenges below and fill out the Team Organization Survey.

Our challenges for the Summer of 2012 are designed to make it easier for new communities to adopt the AguaClara technologies. Our goals are to reduce costs, improve fabrications techniques, extend our designs to lower flow rates, improve our documentation, and create an AguaClara business to facilitate spread of the technologies.

...

Team Name

PDF

Lyx Zip

Advisor

Type of Research

Specialization

Resources

Location

Comments

Students

Stacked Rapid Sand Filtration

Mickey

Design/fabrication

4540

 

B60 B

Chris

3

Demo Plant

Mickey Heidi

Design/Fabrication/Lab testing

4540/Systems

wet bench/shop

B60 A

 

3

Sedimentation Tank Hydraulics

  Heidi

Lab Research

4540

PC

160

Jill

3

Fabrication

Mickey Heidi

Creation of jigs and procedures for assembling plant components

 

dry bench/shop

Project Lab

Harrison

3

Floc Sed Optimization

  Mickey

Lab Research

4540

PC

B60 A L end

 

3

Linear Chemical Dose Controller

Monroe

Component selection and fabrication

hands on design

 

Project Lab

Harrison

1

Foam Filtration

Monroe Mickey

Lab Research

hands on design

PC

Project Lab

 

3

Ram Pump

Monroe

Lit Review/Design/Fabricate

3310

shop/sump pump/water tank

Project Lab

Teresa/ Christine in mid July

0

Design team challenges (Tori Klug)

The design team challenges are available in a separate google doc.

The source file for the tables is Challenges Summer 2012.xlsx.