#Documentation of AguaClara Performance
#Cuatro Comunidades
#Guaimaca
#Atima, Santa Barbara
#Gracias, Lempira
#Agalteca AnchorDocumentation of AguaClara PerformanceDocumentation of AguaClara Performance

Documentation of AguaClara Performance

Anchor
Cuatro Comunidades
Cuatro Comunidades

...

Next week we hope to start work on the fabrication of sed tank lamella modules. Justo, one of the potential plant operators, will participate in order to become familiar with the process.

Anchor
Guaimaca
Guaimaca

Guaimaca

Tuesday 2.03, Wil and John went to Guaimaca to better assess where the city's two treatment plants could be located. Because of the size of Guimaca and the investment involved in constructing the AguaClara plant, we think it is important to leave enough elevation between the plant and the tanks to be able to add filters in the future.

Tank #1 is partially buried in the ground, so that the maximum water level is only about 1.8 m above the surrounding ground. Building up the land about a meter, and with a 2.8 m deep plant, we think 2 m of elevation could still be left between the plant and the tank for the construction of filters.

The site at Tank #2 is more problematic. The tank is located on the point of a hill, and there is no higher ground nearby. One option would be to divert the 8" conduction line to higher ground 400m away and across the main highway. The water would then have to be piped back to the existing tank. Another option would be to build a retaining wall next to the hill and fill in the land to build the plant right next to the tank. A third option we discussed was to build a new tank on a nearby lower hill and build the plant in the location of the current tank. The current tank is only about 12 years old but was poorly built and is not in very good condition. The base and perhaps some of the walls of the current tank could be used for the treatment plant. All three of these options imply added costs, which would have to be calculated to decide which option is more practical.

We also collected the turbidity data the public works manager had been taken. It showed that both of Guimaca's sources have significant and similar turbidity, meaning that two treatment plants are necessary.

We left preliminary plans and a budget with the vice mayor and are hoping to meet with the mayor soon to discuss the possibilities of a project.

Anchor
Atima, Santa Barbara
Atima, Santa Barbara

...

Solidarity International has completed a master plan for water and sanitation for the city of Gracias, which includes $1.3 million of water system improvements in addition to the treatment plant. The $1.3 million budget includes a 250,000 gallon tank. Because of the size of the master plan, improvements must be prioritized and completed piece by piece. The mayor is hoping to start with the construction of the tank and the treatment plant in the same location. APP could also build the tank as part of the same project. Wil gave the mayor preliminary plans and budgets for the tank and an 800 gpm AguaClara plant.

Anchor
Agalteca
Agalteca

Agalteca

On Thursday 2.5 Antonio and Tamar gave a presentation in Agalteca. 14 people were present and very enthusiastic about the potential partnership. This community had been approached by FHIS, (Fundacion Hondurena Inversion Social) to build a FIME plant, but it ultimately did not go through because of resistance to installing flow meters in people's homes.
The entire Junta was present, along with a representative of a local mining company, 'Five Star Mining,' Patronato (Similar to elected community representatives), and a representative of the police force. We are planning to send a letter of intent that we will work on the design, and have a meeting scheduled for Feb. 27th with Jacobo and the Junta to talk more about the terms of the agreement.