*** This version of Confluence is for testing only and contains a copy of content from June 29th 2026. No changes will be preserved. ***
Team Tasks (with optimal number of students and team leader if known)
Design (4)
- update design algorithm descriptions
- update variable list
- design plants for Agua Para el Pueblo
- create method to make it possible to choose a layout
- complete documentation of AutoCAD script generation
- add AguaClara design stamp and disclaimer to drawing
- create layouts of useful views
- Complete LabVIEW online tool
- Create materials list
...
- Test the new design algorithm for linearityWrite a paper detailing the theory and design of the Linear Flow Orifice Meter
- Develop an algorithm for the maximum flow that can be carried by a linear flow orifice meter as a function of pipe diameter.
- Write a paper detailing the theory and design of the Linear Flow Orifice Meter
Flow Controller linearity and calibration
...
- Determine what causes flow to decrease over time and develop a method to prevent this failure mode
Automated chemical doser
- Complete prototype
- Test prototype
- Develop calibration procedure
- Create plan to implement this in an AguaClara water treatment plant in Honduras during the January intersession or provide detailed info for the AguaClara team in Honduras to fabricate and install it during the fall semester.
Floc blanket
*
Pilot Plant
*
Outreach
- Hollister Hall poster*
- Raise $100,000 for water treatment plants to be built between January and August
Wiki
- Update or assign update tasks to teams for all outdated wiki pages.
- Develop organizational guideline for wiki
- Develop guidelines on wiki page size to improve download speed
- Improve theme to make browsing easier and to give a more professional appearance