In Spring 2008, the team went "back to basics" to redesign the demo plant, and to characterize the performance of the demo plant without introducing obstacles. Aside from the plant to be built for demonstration only, the team also built a plant for experimentation. It is hoped that the results of the performance tests will shed some light on the limitations of the plant and thus help explain the results of the experiments done last semester.

Fall 2007 Experiments

  • Introducing Obstacles
    The Demo Plant team experimented with introducing obstacles into the flocculator. The detailed descriptions and results of these experiments can be found in this report.