*** This version of Confluence is for testing only and contains a copy of content from June 29th 2026. No changes will be preserved. ***
| Wiki Markup |
|---|
{composition-setup}
cloak.toggle.exclusive=false
{composition-setup}
h1. Flocculator Design and Construction
h2. Design Objectives
The flocculator is to create the largest flocs possible without causing shear-induced floc breakup. Its hydraulic residence time is to be on the order of 5 minutes, and the flocculator must be both transparent and portable.
h2. {toggle-cloak:id=Theoretical Design} Theoretical Design
{cloak:id=Theoretical Design}
h3. Flocculation Model Determining Amount of Mixing and Maximum Shear
A [theoretical model|^Demo Plant Flocculation Model.xmcd] iswas used to model hydraulic flocculation in the flocculator. The model was first developed by [Dr. Monroe Weber-Shirk|mailto:mw24@cornell.edu] and was subsequently updated as more empirical data became available. The model predicts the amount of mixing, which is the product of shear and residence time, required to achieve a target floc size. The calculation is based on the concentrations of kaolin clay and aluminum sulfate in the feed, and an efficiency factor that accounts for the fact that not every collision between two particles causecauses them to stick together. In addition, the model calculates the maximum shear that a floc can withstand as a function of how much mixing it has gone through, based on the empirically-determined shear strength of aluminum sulfate flocs.
Since the new demo plant will be constructed out of the same corrugated plastic as the existing demo plant, it will have 10 mm by 7 mm channels. It has been [experimentally observed|Demo Plant Flocculation Efficiency] that the biggest flocs that the existing demo plant can create is about 0.7 mm in diameter. Hence, the target floc size was set to 1 mm. The feed clay concentration was set to 500 mg/L, with a corresponding turbidity of 180 NTU. The [aluminum sulfate dose|^Demo Plant Alum Dosage.xmcd] was set to 45 mg/L. Finally, the efficiency factor was experimentally determined to be 0.2.
h3. Flocculator Design
The [flocculator design program|^Demo Plant Flocculator.xmcd] was initially written in Fall 2007 as part of a CEE 454 final project, to create a design with varying baffle spacing such that the flocculator is as compact as possible. Since corrugatedthe plasticnew withdemo uniformplant corrugations will be used, the constructed out of the corrugated plastic, it will have uniform channels. The program was therefore altered to accept a preset, uniform baffle spacing instead of determining them.
The program starts designing the flocculator from its exit. The dimensions of the last channel is determined from the baffle spacing, channel width and the given height of water. The degree of mixing provided by each channel is calculated from the plant flow and the dimensions of the channel. The number of channels required is then obtained by dividing the required amount of mixing calculated by the flocculation model by the degree of mixing provided by each channel. The maximum shear in each channel is also calculated using the channel dimensions and plant flow. The maximum shear is constant for all the channels since the channel dimensions are uniform.
The head loss in each channel is calculated by summing the frictional loss caused by the channel walls, and the expansion loss caused by the 180° turn at the end of the channel. The head loss is incremented every channel to determine the hydraulic profile. A given headroom is added to the height of the water in the first channel to give the height of the flocculator. The clearance between the end of each baffle and the water surface or flocculator floor is 2.5 times the baffle spacing.
{cloak}
h2. {toggle-cloak:id=Design Results} Design Results
{cloak:id=Design Results}
The new flocculator has 31 channels and is about 35 cm long. The corrugated plastic dictates that each channel will be 0.7 cm by 1 cm. The clearance between the end of each baffle and the water surface or flocculator floor is 2.5 cm. The plant flow is 100 mL/min and the height of the water in the last channel is 25 cm, in order for the new flocculator to be compatible with the existing sedimentation tank. The height of the water in the first channel is about 26 cm and the headroom is set to be 2 cm. The flocculator is therefore 28 cm tall. The maximum shear in the flocculator is 45/s and the total mixing is 5300. The residence time is about 5.434 minutes.
!Demo Plant Pictures and Figures^Demo Plant Flocculator AutoCAD.jpg|thumbnail!
An [ISO A1 construction drawing|^Demo Plant Flocculator.pdf] was also created for the flocculator and a similar drawing was released for construction.
{cloak}
h2. {toggle-cloak:id=Construction} Construction
{cloak:id=Construction}
h3. Materials
In building the plant, we used corrugated plastic for the lamellaClear corrugated plastic, with 0.7 cm by 1 cm channels, was chosen to be used to build the flow channels due to its lightweight and ease of construction. The corrugatedbottom plasticof wethe choseflocculator was 0.7 cm thick and had a flute thickness of 1.0 cm. The plastic was cut to size, and alternate ridges were cut out from the inside of the material on each end made from a 1 inch diameter acrylic rod. Stands for the flocculator was made out of acrylic slabs.
h3. Construction Process
A square of corrugated plastic with the required number of channels was cut out from a larger sheet. A chisel and pliers were then used to cut out corrugations in order to join the channels.
The acrylic rod was milled flat on one side to be joint with the corrugated plastic. A channel is also drilled into one end of the rod to form the bodychannel ofjoining the flocculator and the sedimentation tank. This was mounted onto an acrylic cylinder. The stands were then made out of two plastic pieces and a screw, as shown in the picture. 2 grooves are cut into that end of the rod for the sealing O-rings.
Finally, the corrugated plastic and the acrylic rod was joint using acrylic bonding agent and air dried. Any leaks were sealed with the glue.
Most construction work was performed by Paul Charles of the Civil and Environmental Engineering
h3. Finished Product
A photograph of the final design of the flocculator is shown below. Most construction mentioned on this page was done by Paul and Tim in the Machine Shop in Hollister Hall, Cornell University.
Picture of Flocculator.
{cloak} |