Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

 

B60

B62

160

150

Project Space

Basic Tools

Drawer to left of sink

Drawer in center of countertop

Drawer to right of right sink

--

Red tool box to left of entrance door

Specialty Tools

Drawer to left of sink

--

--

--

--

Tubing

Cabinet to right of sink

--

Drawer to right of sink

--

White drawer to left of entrance door

Push to Connect Fittings

Filing unit on left side of room

--

Drawer to right of sink

--

Black drawer and yellow drawers to left of entrance door

Barbed Fittings

Filing unit on left side of room

--

Drawer to right of sink

--

Black drawer to left of entrance door

PVC Fittings

--

--

--

--Blue cabinet 2 and 4

White drawer to left of entrance door

PVC Primer and Cement

Drawer to left of sink

--

--

--

--

Pressure Sensors

--

--

Drawer to right of sink

 Blue cabinet 1

next to the white drawers, near the door of B60

Solenoid Valves

Drawer labeled "Valves, Clamps"

--

Drawer to right of sink

Drawer to right of distilled water station in back corner

--White drawer to left of entrance door

Pumps

Cabinets to left of sink

--

--

--

--

Turbidimeters

Cabinets to left of sink

--

--

--

--

RS 485 cables

--

--

--

--

Blue cabinet 1

RS 485 to 232 converter

Filing unit on left side of room

--

--

--

--

pH Probes, dissolved oxygen meters, temperature probes

--

--

--

Hanging on wall next to fume hood

--

Relay boxes

--

--

--

--

Blue cabinet 3

Extension cords, power strips

--

--

--

--

Blue cabinet 3