UPS inventory for CCB Clusters and non-cluster HPCs

Note: Currently none of the clusters ChemIT manages have UPSs for their computer nodes.

Upgrade status14: Within year, upgrade OS?
No h/w upgrades plannedFall'13: Upgraded OS and added 2 nodesSpring'14: Upgraded OS and added 2 nodes

Cluster name

UPS for
main system or headnode

Maintenance
window

UPS shutdown algorithm, if any

Tools usedOther notes

Abruna

NONE
Unique: Need to do ASAP (no backup of OS!)

 n/a4

n/a 

Ananth

 (unknownUnknown) 

n/a

n/aCluster managed by CAC, not ChemIT

Collum

Done Spring'14

 

  

Hoffmann

Done Spring'14

 Winter'13/14: Upgraded OS and added 2 nodes

  

Lancaster (w/ Crane)

Done Spring'14
(Funded by Crane)

 Spring'14: Upgraded OS and added 2 nodes

  

Loring

NONE
Unique: Need to do ASAP (no backup of OS!)

 n/a

4/14: When do OS upgrades, and why?
No hardware upgrades planned

n/a 

Scheraga: Current, production MatrixScheraga

Done Fall'14
(See chart below for stand-alone computational (GPU) computers)

 

 

Summer'14: $50K hardware upgrades; to include OS upgrade.

 
Scheraga: Forthcoming Matrix

Done Fall'14
(See below for stand-alone computational (GPU) computers, if any are to remain as such)

UPS supporting both Synology storage system and headnode.

UPS USB-connected to Synology storage system. Synology thus sends a signal to headnode. Algorithms are:

  • Synology:
  • Headnode:

Synology's own s/w.

On Linux systems, running "nut".

 

Widom

Yes
Waiting for head node to deploy (on C4 at the moment)

 

  

ChemIT (C4)

Done
Old UPS; on the margin

 4/14: When turn into production, and for whom?

  
Baird: 1 rack-mounted computational computer

NONE
ChemIT recommended making this investment (standard of practice), but group decided explicitly not to make the investment.

n/an/a  
Freed: EldorNONE n/an/a 
Petersen: 2 rack-mounted computational computers

Yes, but needs to be deployed in true production; using Widom's UPS for now.
ChemIT using UPS for testing UPS-related control software.

 

.

UPS supporting both stem #50 and system #51.

UPS USB-connected to system #50, which itself does not send signal to system #51.

On system #50: Shutdown if only 10% battery power is left.

On system #51: No s/w running to listen for signal from system #50(if signal were to be sent).

Windows OSTo do: Establish sending a signal from system #50 to system #51 and have system #51 properly shut down in the event of a prolonged outage. 
Scheraga: 4 GPU rack-mounted computational computers

NONE
($900, estimate)
Need to protect? Data point: Feb'14 outage resulted in one of these not booting up correctly.

   n/an/a   

What does it cost to UPS a research

...

system?

Assuming protection for 1-3 minutes MAXIMUM:

Current goal: Do all head nodes and stand-alone computers in 248 Baker Lab. Started getting done, fall 2014.

Assuming protection for 1-3 minutes MAXIMUM:

About $180 (APC brand) per head node or server every ~3-4 years  (3 yr for warranty and ~4 years actual battery life).

  • Unusual case: And ~$900/ set of 4 GPU systems (Scheraga) every ~3-4 years (to for this, must confirm approach, appropriateness, and estimates).

CCB head nodes' UPS status:

Remaining UPS's to invest in

...

Computer

Done

Note done

Notes

Coates: MS SQL Server

 

X

Unique: Need to do ASAP

Freed: Eldor

 

X

Unique: Need to do ASAP? (Q: Is OS backed up?)

Baird: 1 rack-mounted computational computer

 

X

Need?

 

 

 

 

Review  Review others at above two cited pages which might need a UPS, after above ones done.

...