Mon 7/12 | Meeting: Design Team, Chemical Dose Controller, ANC Control, and Tube Floc teach ins |
Mon 7/12 - Fri 7/16 | Continue to work on design or research |
Fri 7/16 | Summary Reports for design due at 5 PM |
Sat 7/17 | Picnic details TBD |
Week 6
Mon 7/19 | Meeting: Plate Settler Spacing, Foam Filtration, and Stacked Rapid Sand Filtration teach ins |
Mon 7/19 - Fri 7/23 | Continue to work on design or research |
Fri 7/23 | Reflection Reports due 5 PM |
Week 7
Mon 7/26 | Meeting: Plate Settler Spacing teach ins and Final Presentation for design and some research Design, ANC Control, Chemical Dose Controller and Tube Floc teams |
Mon 7/26 - Fri 7/30 | Continue to work on design or research |
Thu 7/29 | First draft of your final wiki is due at 5 PM |
Sun 8/1 | First draft of wiki is handed back |
...