The inlet channel was modified to have only one opening leading to the sedimentation tank instead of two. See the explanation for this under Sedimentation Tank. The concrete in the inlet channel will be rounded going into the pipe so that the transition of flow is smoother. the construction sequence for this transition will be done as follows:
before pouring the concrete for the base slab of the inlet cchannel, a 90 deg elbow will be coupled to the 6" pipe (substituting the chimeneys). The idea is thet the concrete follows the shape of the elbow in the bottom slab of the channel to reduce the expansion los created by the change in direction of the flow. Please refer to the !Construction sequence|Construction sequence.PNG! graphical explanation
Sedimentation Tank
...