*** This version of Confluence is for testing only and contains a copy of content from June 29th 2026. No changes will be preserved. ***
2/20/2008
Mesh for 180 pipe using the baffle spacing of pilot plant: 0.1 x 1 m Mesh vertical (first length = 0.001, interval count = 100) Horizontal (successive ratio = 1.1, first length = 0.001)
2/18/2008
Mesh for 180 pipe bend done for both sharp turn and smooth turn. Mesh criteria: successive ration 1.1. Interval size = 0.1 for vertical line and 0.05 for horizontal line.
...