Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

2/18/2008
Mesh for 180 pipe bend done for both sharp turn and smooth turn. Mesh criteria: successive ration 1.1. Interval size = 0.1 for vertical line and 0.05 for horizontal line.

...