After consulting with engineer Wil Serrano, the ports between the flocculator channel need to be switched from the bottom of the tank to the top. From a structural perspective it is much better to be able to tie the walls together at the top of the wall.
Flocculator drain system
Josiah, Taisuk, Jeff - Est. Completion Date 7/12/09
The flocculator drainage system needs to be designed now that we are using ferrocement baffles for larger plants. The two options for draining the flocculator were to
...