Summer 2009 Contributions
I am a member of the Design Team. My subteam updated My first task was to update the ports between flocculator channels, and the inlet port, from the top to the bottom of the tank walls. This is better for structural reasons. This also required us to change the order of baffle heights to From a structural perspective, this is more sound. The baffle heights had to be changed to accommodate this new water pattern .Paragraph (really, just one please ) explaining contributions to date. Provide links to pages you worked on. Ex. "I re-wrote the main chemical doser page so that it is up-to-date to reflect the new research we are conducting."(i.e. up-down instead of down-up). The current task is to add the exit port that connects the flocculator tank to the sedimentation tank. This requires me to adjust the number and spacing of the baffles in the last channel of the flocculator to fit with this port. You can see our work here.