...
I originally worked at the Pilot Plant summer 2008 and spent the Fall semester taking CEE 454, as well as being able to travel with members of the AguaClara team to Honduras over winter recess. During the Spring 2009 semester I resumed worked with the Pilot Plant team, specifically designing and constructing a new baffle system for the flocculation tank, which has been completed and installed at the pilot plant and am now currently working on building an additional system so we can swap out the systems and change configurations while keeping the tank running and obtaining resultswhich allowed us to run multiple configurations to try and find the best energy dissipation rate(s) for producing low turbidity effluent water. As subteam leader I have been working to keep the team motivated and distributing work evenly among all group members while making sure all voices are heard. This has been very important, since our design of the new baffle system was very pragmatic and as a group we were vetted out the flaws in each iteration of our design until an effective and simple design was achievedspearheaded our testing and spent enough time at the Cornell Water Filtration Plant that I was hoping they would start giving me a paycheck thinking I was a plant operator. After running 12 configurations at 2 different flow rates we narrowed down our range of effective dissipation rates, but still need to run more configurations to be able to present conclusive and definitive results.
Content Created
| Wiki Markup |
|---|
{content-by-user:jak232}{content-by-user} |