...
Kellie and I each spent several afternoons at the pilot plant trying to form sludge blankets. We also tried to design a way to drain a sludge blanket to a certain height. In addition, I worked with the operators to fix equipment that wasn't working, such as peristaltic pumps. I also worked with Tom to fix one of the biggest problems we had this semester: we discovered before Thanksgiving Break that alum dosing had not been running for some time. Tom and I troubleshot this problem and determined an optimal alum dose for winter conditions. I've documented these and other problems on the Troubleshooting page.
In addition, I was the unofficial photographer for the pilot plant team this semester. Most of the photos we've taken I've embedded in or attached to the sed tank pages. I also created a permalink to the pictures we took this semester so that future teams would be able to access them.
Among the pages I've created are the Fall 2008 portion of Construction History, the Troubleshooting page, the Maintenance and Tips page, and about half of the Sed Tank Team Meeting Minutes pages. I've also helped improve old pages, including Construction History and Methods and Results.
...