*** This version of Confluence is for testing only and contains a copy of content from June 29th 2026. No changes will be preserved. ***
...
After the baffles have been cut, string them onto the 4X6ft pieces of PVC piping, alternating Upper and Lower baffles. Next arrange the baffles to the desired spacing, and clip on the spacers to ensure that correct spacing is maintained.
Dimensions for lower baffles:
Dimensions for upper baffles:

